PROJECT NAME: Najmat Development District Cooling Plant
LOCATION : Reem Island
EMIRATE : Abu Dhabi, UAE
PLOT NO : 202-000-C20
CLIENT : M/S Najmat Abu Dhabi
CONSULTANT : M/S Allied Consultant LTD
MAIN CONTRACTOR : M/S ADC Energy Systems.
ENABLING CONTRACTOR : Hig Deep
PROJECT CATEGORY : Shoring and Piling Work
SHORING WORK

Najmat Development District Cooling Plant

Reem Island Abu Dhabi plot no. 202-000-C20 UAE.

HIGH DEEP FOUNDATION CONTRACTING

Project Info

CLIENT
:
M/S NAJMAT
CATEGORY
:
SHORING WORK (OUTER)
LOCATION
:
REEM ISLAND ABU DHABI
CONSULTANT
:
M/S ALLIED CONSULTANT LTD
MAIN CONTRACTOR
:
Completed
ENABLING CONTRACTOR
:
$200,560

Project Overview

SHORING WORK (OUTER) : 335 L.M (396 1m DIA Pile With Different Depth (6-18M), 335 L.M Capping Beam, 600 L.M Strut Pipe Support With 32 Corpel.

1️⃣ INTERNAL SHORING : 65 L.M (80 75 cm DIA pile) with different depth (6-8m).

2️⃣ PILING WORK : 322 Pile 1 M DIA with different cut off level and toe level (10-20 m depth).

3️⃣ PILING TESTS : 3 Working load test, 1 Preliminary load test, 16 Dynamic test, 32 Sonic test and 322 integrity test.

img

Full Principal Contractor service

There are many passages of lorem ipsum available

img

Full-time Onsite Supervision

There are many passages of lorem ipsum available

img

Timber and steel frame construction

There are many passages of lorem ipsum available

PROJECT DETAILS
Our Projects

ProjectDetails

🏗️ Project: Najmat Development District Cooling Plant – Reem Island, Abu Dhabi (Plot No. 202-000-C20)

Client: M/s Najmat Abu Dhabi
Consultant: M/s Allied Consultant Ltd.
Main Contractor: M/s ADC Energy Systems
Enabling Contractor: High Deep Foundation Contracting L.L.C.

PROJECT OVERVIEW
Our Projects

ProjectOverview

The Najmat Development District Cooling Plant is a critical infrastructure facility located in the heart of Reem Island, Abu Dhabi, designed to provide sustainable and efficient cooling services to the surrounding development zones.
As part of this high-value infrastructure project, High Deep Foundation Contracting L.L.C. (HDFC) was appointed as the Enabling and Foundation Contractor, responsible for executing comprehensive shoring and piling works that ensure the long-term structural integrity of the plant’s substructure.

A HIG DEEP INNOVATION
Scope of Work

Executed by High Deep

HDFC delivered a complete range of enabling works, covering both outer and internal shoring systems, as well as deep foundation piling.

1️⃣ Outer Shoring Works

  • Length: 335 Linear Meters
  • Pile Specification: 396 piles (1.0 m diameter)
  • Depth Range: 6 to 18 meters
  • Additional Works:

    • 335 L.M. Capping Beam
    • 600 L.M. Strut Pipe Support System equipped with 32 Corbel connections

These systems were designed and installed to stabilize the excavation perimeter, ensuring complete soil retention and structural safety during the deep foundation and basement construction phases.

2️⃣Internal Shoring Works

  • Length: 65 Linear Meters
  • Pile Specification: 80 piles (0.75 m diameter)
  • Depth Range: 6 to 8 meters

The internal shoring system provided additional support to internal excavations, effectively managing lateral soil pressure and preventing deformation during construction activities.

3️⃣Piling Works

  • Quantity: 322 foundation piles
  • Pile Diameter: 1.0 meter
  • Depth Range: 10 to 20 meters (varied cut-off and toe levels)

These cast-in-situ bored piles form the main foundation system for the cooling plant, providing vertical and lateral load-bearing capacity required for the facility’s structural and operational stability.

🧪 Testing and Quality Assurance

🧪 Testing and Quality Assurance

To ensure the highest levels of quality, safety, and reliability, HDFC conducted extensive field and laboratory testing in compliance with international standards:

  • 3 Working Load Tests (WLT)
  • 1 Preliminary Load Test (PLT)
  • 16 Dynamic Load Tests (DLT)
  • 32 Sonic Integrity Tests (SIT)
  • 322 Pile Integrity Tests (PIT)

All tests confirmed optimal performance, pile integrity, and compliance with engineering specifications.

PROJECT DETAILS
Our Projects

ProjectHighlights

01

Successful Completion

Successfully executed complex deep excavation and shoring works within a restricted site in Reem Island.

02

BEST SAFETY PROVIDED

Achieved zero safety incidents during operations.

03

ON TIME COMPLETION

Delivered all enabling and piling works on schedule and in full compliance with client and consultant specifications.

04

ADVANCED TECHNOLOGY

Utilized advanced drilling and strutting technologies to ensure precise alignment and minimal vibration impact.

BENEFIT

🏆 Result

The successful completion of HDFC’s enabling and piling works laid the groundwork for one of Abu Dhabi’s key sustainable infrastructure facilities. The project showcases HDFC’s engineering precision, adherence to EHS standards, and commitment to quality performance across all stages of foundation and substructure works.