PROJECT NAME:Capital One Motor City Office Building
LOCATION : Motor City
EMIRATE : Dubai, UAE
PLOT NO : 6740191
CLIENT : Centuria Capital LLC
CONSULTANT : AE7
SHORING CONTRACTOR : HighDeep
PROJECT VALUE : 13,600,000 AED
ONGOING WORK

Capital One Motor City Office Building

PLOT NO: 6740191 (2B+G+19 OFFICE FLOORS + ROOF + TOP OF ROOF), DUBAI - UAE

PROJECT VALUE : 13,600,000 AED
PROJECT DETAILS
Our Projects

ProjectDetails

🏗️ PROJECT : CAPITAL ONE MOTOR CITY- OFFICE BUILDING (2B+G+19 OFFICE FLOORS + ROOF + TOP OF ROOF)

➡️ Plot NO: 6740191
➡️ Location: Motor City, Dubai
➡️ Client: Centuria Capital LLC
➡️ Consultant: AE7
➡️ Shoring Contractor: High Deep Foundation Contracting L.L.C.
➡️ Scope: Tangent pile shoring with anchored and free cantilever systems supporting deep excavation up to 9.70 m
➡️ Key Works: 520 L.M tangent piles, 54 ground anchors, 185,000 m³ excavation
➡️ Status: Ongoing
➡️ Project Value :13,600,000 AED

 

PROJECT OVERVIEW
Our Projects

ProjectOverview

High Deep Foundation Contracting L.L.C. was appointed as the Shoring Contractor for the Capital One Motor City Office Building project, a high-rise commercial development comprising 2 basements, ground floor, 19 office floors, roof, and top-of-roof structures. The project required a robust excavation support system to safely retain deep excavation works within an urban environment.

The scope of work involved the design, installation, and execution of tangent pile shoring systems, supported by ground anchors, to facilitate excavation and subsequent construction activities up to the required formation level.

A HIG DEEP INNOVATION
Scope of Work

Executed by High Deep

HDFC executed extensive secant pile shoring works to safely retain excavation up to a maximum depth of 15 meters. The shoring system was designed and installed to ensure excavation stability, control ground movement, and protect adjacent structures.

1️⃣ Shoring Works

HDFC executed comprehensive shoring works using tangent pile retaining systems, designed to provide lateral earth support and ensure excavation stability throughout all construction stages.

  • Installation of 400 linear meters of tangent piles with 1000 mm diameter, designed as free cantilever piles, forming the primary excavation retention system.
  • Installation of 120 linear meters of tangent piles with 750 mm diameter, supported by 54 ground anchors, to enhance lateral stability in critical zones.
  • Ground anchors were designed, installed, tested, and locked-off in accordance with engineering specifications to resist earth pressures and minimize wall deflection.
  • The shoring system was executed to safely retain excavation up to a maximum depth of 9.70 meters, ensuring protection of adjacent properties and infrastructure.

2️⃣ Excavation Works

  • Controlled excavation carried out to formation level following completion of shoring installation.
  • Total excavation quantity handled was approximately 185,000 cubic meters, executed in stages to maintain excavation stability and safety.
  • Continuous monitoring was undertaken to ensure compliance with design tolerances and safety requirements.

3️⃣ Engineering, Safety & Quality Compliance

  • All shoring and excavation works were carried out in strict accordance with consultant-approved designs, method statements, and international standards.
  • HDFC implemented comprehensive HSE management systems, ensuring safe execution within a live construction environment.
  • Quality control procedures included inspection, monitoring, and documentation of pile installation, anchor works, and excavation progress.
🔧 Technical Highlights

🔧 Technical Highlights

  • Project Type: High-Rise Office Building (2B + G + 19 Floors + Roof + Top of Roof)
  • Location: Motor City, Dubai – Plot No. 6740191
  • Shoring System: Tangent pile retaining wall (free cantilever & anchored system)
  • Tangent Piles Installed:
    • 400 L.M – Ø 1000 mm (Free Cantilever)
    • 120 L.M – Ø 750 mm (Anchored)
  • Ground Anchors: 54 Nos. shoring anchors
  • Maximum Excavation Depth: 9.70 m
  • Excavation Quantity: Approx. 185,000 m³
  • Execution Scope: Shoring works and excavation support
  • Project Value: AED 13.6 Million
  • Status: Ongoing
  • Safety & Quality: Executed in compliance with consultant-approved designs, QA/QC, and HSE standards

🔧 Summary of Key Deliverables

  • Tangent pile shoring system (Ø 1000 mm & Ø 750 mm)
  • Free cantilever and anchored shoring solutions
  • Installation of 54 ground anchors
  • Safe excavation to 9.70 m depth
  • Large-scale excavation management (185,000 m³)
  • Full compliance with safety, quality, and engineering standards