PROJECT NAME: Burj Capital Commercial Building
LOCATION : Business Bay, Dubai
EMIRATE :Dubai, UAE
PLOT NO : 3460569
CLIENT : M/s Centurion Capital One Properties LLC
CONSULTANT : M/s Datum Engineering Consultants
SHORING CONTRACTOR : Hig Deep
PROJECT VALUE : 33,000,000 AED
ONGOING PROJECT

Burj Capital Commercial Building

High-Rise Commercial Building (5B + G + 3P + 25 Floors + Service Floor + Roof) – Plot No. 3460569, Business Bay, Dubai

PROJECT VALUE : 33,000,000 AED
PROJECT DETAILS
Our Projects

ProjectDetails

🏗️ PROJECT : Burj Capital Commercial Building High-Rise Commercial Building (5B + G + 3P + 25 Floors + Service Floor + Roof)

➡️ Plot NO: 3460569
➡️ Location: Business Bay, Dubai
➡️ Client: M/s Centurion Capital One Properties LLC
➡️ Consultant: M/s Datum Engineering Consultants
➡️ Shoring Contractor: High Deep Foundation Contracting L.L.C.
➡️ Scope: Diaphragm wall shoring with three levels of strutting and deep excavation up to 23 m
➡️ Key Works: 287 L.M diaphragm wall (800 mm), 3-level strut system, 135,000 m³ excavation
➡️ Status: Ongoing
➡️ Project Value :33,000,000  AED

 

PROJECT OVERVIEW
Our Projects

ProjectOverview

High Deep Foundation Contracting L.L.C. was appointed as the Shoring Contractor for the Burj Capital Commercial Building, a landmark high-rise development comprising 5 basements, ground floor, 3 podium levels, 25 office floors, a service floor, roof, and top-of-roof structures, located in the prime Business Bay district of Dubai.

The project required a highly robust and engineered excavation support system to facilitate deep excavation works within a dense urban environment, while ensuring stability, safety, and minimal ground movement.

HDFC executed the complete diaphragm wall shoring system, designed to retain excavation up to a depth of 23 meters. The system consisted of reinforced concrete diaphragm walls with multi-level internal strutting to counteract lateral earth and groundwater pressures.

A HIG DEEP INNOVATION
Scope of Work

Executed by High Deep

 

1️⃣ Shoring Works

  • Construction of 287 linear meters of diaphragm wall, with a wall thickness of 800 mm, forming a continuous and stiff retaining system around the excavation perimeter.
  • Installation of three layers of steel struts, designed and executed to provide staged lateral support during progressive excavation phases.
  • The diaphragm wall system was engineered to control wall deflection, protect adjacent properties, and ensure excavation stability throughout all construction stages.

2️⃣ Internal Shoring Works

  • Excavation carried out in a controlled and sequenced manner following completion of diaphragm wall and strutting installation.
  • Maximum excavation depth achieved: 23.0 meters.
  • Total excavation quantity handled was approximately 135,000 cubic meters, executed in compliance with approved method statements and safety requirements.

3️⃣ Engineering, Safety & Quality Compliance

  • All works were executed in accordance with consultant-approved designs, project specifications, and international engineering standards.
  • Continuous monitoring of excavation and shoring performance was carried out to ensure structural integrity and safety.
  • Strict HSE, QA/QC, and documentation procedures were implemented throughout the project lifecycle.
🔧 Technical Highlights

🔧 Technical Highlights

  • Project Type: High-Rise Commercial Building
    (5B + G + 3P + 25 Floors + Service Floor + Roof)
  • Location: Business Bay, Dubai – Plot No. 3460569
  • Shoring System: Reinforced concrete diaphragm wall with internal strutting
  • Diaphragm Wall Installed:
    • 287 L.M, 800 mm thickness
  • Strutting System:
    • 3 levels of steel struts
  • Maximum Excavation Depth: 23.0 m
  • Excavation Quantity: Approx. 135,000 m³
  • Project Value: AED 33 Million
  • Contractor Role: Shoring Contractor
  • Execution Standards: Consultant-approved designs, full QA/QC & HSE compliance
  • Project Status: Ongoing

Summary of Key Capabilities Delivered

  • Tangent pile shoring system (Ø 1000 mm & Ø 750 mm)
  • Free cantilever and anchored shoring solutions
  • Installation of 54 ground anchors
  • Safe excavation to 9.70 m depth
  • Large-scale excavation management (185,000 m³)
  • Full compliance with safety, quality, and engineering standards