Reem Island Abu Dhabi plot no. 202-000-C20 UAE.
SHORING WORK (OUTER) : 335 L.M (396 1m DIA Pile With Different Depth (6-18M), 335 L.M Capping Beam, 600 L.M Strut Pipe Support With 32 Corpel.
1️⃣ INTERNAL SHORING : 65 L.M (80 75 cm DIA pile) with different depth (6-8m).
2️⃣ PILING WORK : 322 Pile 1 M DIA with different cut off level and toe level (10-20 m depth).
3️⃣ PILING TESTS : 3 Working load test, 1 Preliminary load test, 16 Dynamic test, 32 Sonic test and 322 integrity test.
There are many passages of lorem ipsum available
There are many passages of lorem ipsum available
There are many passages of lorem ipsum available
🏗️ Project: Najmat Development District Cooling Plant – Reem Island, Abu Dhabi (Plot No. 202-000-C20)
Client: M/s Najmat Abu Dhabi
Consultant: M/s Allied Consultant Ltd.
Main Contractor: M/s ADC Energy Systems
Enabling Contractor: High Deep Foundation Contracting L.L.C.
The Najmat Development District Cooling Plant is a critical infrastructure facility located in the heart of Reem Island, Abu Dhabi, designed to provide sustainable and efficient cooling services to the surrounding development zones.
As part of this high-value infrastructure project, High Deep Foundation Contracting L.L.C. (HDFC) was appointed as the Enabling and Foundation Contractor, responsible for executing comprehensive shoring and piling works that ensure the long-term structural integrity of the plant’s substructure.
HDFC delivered a complete range of enabling works, covering both outer and internal shoring systems, as well as deep foundation piling.
Additional Works:
These systems were designed and installed to stabilize the excavation perimeter, ensuring complete soil retention and structural safety during the deep foundation and basement construction phases.
The internal shoring system provided additional support to internal excavations, effectively managing lateral soil pressure and preventing deformation during construction activities.
These cast-in-situ bored piles form the main foundation system for the cooling plant, providing vertical and lateral load-bearing capacity required for the facility’s structural and operational stability.
To ensure the highest levels of quality, safety, and reliability, HDFC conducted extensive field and laboratory testing in compliance with international standards:
All tests confirmed optimal performance, pile integrity, and compliance with engineering specifications.
Successfully executed complex deep excavation and shoring works within a restricted site in Reem Island.
Achieved zero safety incidents during operations.
Delivered all enabling and piling works on schedule and in full compliance with client and consultant specifications.
Utilized advanced drilling and strutting technologies to ensure precise alignment and minimal vibration impact.
The successful completion of HDFC’s enabling and piling works laid the groundwork for one of Abu Dhabi’s key sustainable infrastructure facilities. The project showcases HDFC’s engineering precision, adherence to EHS standards, and commitment to quality performance across all stages of foundation and substructure works.